![]() |
| Bow thruster progress |
Showing posts with label Refits. Show all posts
Showing posts with label Refits. Show all posts
Friday, March 29, 2013
Dyer 29 Refits
We have a Dyer 29' in the shop for the 2nd winter season in a row for additional refits. Last winter season she got new windows and opening windshields, new paint job from the rub rails up, a toe rail refit including drain holes as well as a complete stripping of the teak and re-varnish. This year she's being refitted with a bow thruster, new water tanks and a soft headliner with teak strips.
Friday, February 8, 2013
Mathews 40' Refit
One of our 40's is here in the shop for a Gen Set and AC refit this winter; Dave and the guys have been making good progress. In addition to these major upgrades, the boat will be outfitted with trim tabs and completely spruced up for the coming season!
![]() |
| Bilge Access in Cabin open for Accessibility |
Friday, February 1, 2013
Sandy Repairs
We received the first boat damaged by Sandy from New Jersey on wednesday. She's here for a refit so she can go back to NJ looking like new!
Tuesday, January 29, 2013
Hampton Sailboats
Whew! January is getting away from us! Most of the boats are covered up with plastic due to other ongoing projects and I can never seem to catch them while they are uncovered and being worked on! This is pretty much what it looks like in the shop:
One of our many ongoing projects is a Hampton that has been returned to us this winter for a spruce up after 11+ years. The Hampton One Design (HOD) Sailboats were the first boats that MathewsBros built. When they first opened shop in 1995, they were focused on repairs and refits - something that has come full circle! A year or so into their business, the HOD class approached them about building their boats. To date they've built a total of 19 Hamptons.
![]() |
| Boats Covered in Plastic to Keep Clean |
One of our many ongoing projects is a Hampton that has been returned to us this winter for a spruce up after 11+ years. The Hampton One Design (HOD) Sailboats were the first boats that MathewsBros built. When they first opened shop in 1995, they were focused on repairs and refits - something that has come full circle! A year or so into their business, the HOD class approached them about building their boats. To date they've built a total of 19 Hamptons.
Friday, January 4, 2013
Hit the Ground Running!
![]() |
| Varnish prep on a 38' Eastbay |
We have hit the ground running on this chilly beginning to
the new year! The guys out in the shop
have cleaned up the shop and have it ready for the winter/spring work to be
done. The Pearson that's had an all-encompassing refit is nearly finished with thru hulls being installed and lights getting wired in. The guys have also been prepping for a couple of varnish jobs.
![]() |
| Pete's Boat Notes |
In the office here, Pete is working out the schedule of all of the work
to be done this winter and spring. He is also working on estimates on everything from Comet Sailboat repair to glassing an older Robbins boat to damaged boats in the NY/NJ area from Super Storm Sandy. Pete is actually heading up to the Long Island area next week to look at more boats in need of estimates.
| Monmouth Bay, NJ after Superstorm Sandy
http://news.yahoo.com/photos/sandy-from-above-slideshow/boats-seen-yard-where-washed-onto-shore-during-photo-190659185.html
|
Tuesday, August 28, 2012
Wooden Cruiser
Pete has been restoring a 1956 Wooden Cruiser this past week and a bit. It had some areas of rot which he stripped and is in the process of replacing. All of the clamps you see below is from putting a rub rail on. Once he's finished replacing all of the problem areas, next up will be varnish to have her looking Beautiful Once Again!
![]() |
| New Rub Rail |
![]() |
| Seats in the Cockpit |
Thursday, July 12, 2012
Sail Away to Virginia
| Galley Before Refit |
![]() |
| Galley After Refit |
![]() |
| New Galley Sink |
![]() |
| New onboard cooking option - double burner recessed ethanol cooktop |
![]() |
| New countertop and fiddle in Head On the exterior of the boat, a gennaker pole was added to the bow as was a windlass and pop-up cleats for spring lines were added to both port and starboard sides. |
![]() |
| Gennaker pole |
![]() |
| Pop-Up Cleat |
Friday, June 15, 2012
Fuel Tanks and Engine Covers
Although we're still launching boats for the season, this week we're featuring some of our ongoing projects. We've got a Downeast Trawler over at the landing in which we recently installed 86 gallon fuel tanks. One had a leak and since they're both the same age, it was decided to replace both of them due to the probable integrity of the second tank. This week we've been able to get the decking back down over top of the tanks. The Teak & holly will be glued down with epoxy and sealed before being varnished to give it a finished look.
![]() |
| Hatch Opening over Fuel Tank |
![]() |
| Plywood Base for Decking |
![]() |
| Teak & Holly Deck |
Thursday, April 12, 2012
Spring!!
![]() |
| Buffing the Boat |
![]() |
| Finishing up the Portholes |
![]() |
| Engine of the 40' |
![]() |
| Helm & Rewiring on the 40' |
| Varnish Work on 22' |
![]() |
| Gel Coat & Awlgrip Repair on 22' |
Subscribe to:
Posts (Atom)




























